b. Install full-length bumpers and internal
trims offset across joints. Make sure that
no gaps exist between sections. Continue
installing the bumpers the length of the
lineup.
5. Once all except the last section of bumper
have been installed, refrigerate the merchan-
diser lineup for at least six (6) hours.
The last
section of bumper should be kept inside a cooler
or refrigerated merchandiser during this time.
This will allow the bumper to contract.
6. Go to the right end of the lineup, and tap
the bumper to close any gaps.
7. Measure and cut last
sections of bumper. Use a
miter box and fine-tooth
saw to cut last bumper to
length. Install the last
section.
8. Remove protective
film from bumper once
installation is complete.
Starter
Bumper
Retainer
Merchandiser
Joint
Full Length
Bumper
Internal Joint Trims
Bumper
Miter Box