2
DOE 2012
Energy Efficiency
Compliant
Hussmann refrigerated merchandisers configured for sale for use in the United States
meet or surpass the requirements of the DOE 2012 energy efficiency standards.
Notice 3
General Information
4
Case Sections
5
Installation 6
Unloading
Receiving Case
6
Snapping Chalk Lines
6
Placement
7
Lifting / Panels
Q3MV-BC Lifting and Transport Instructions 8
Front Body Panel Install
9
Fasten Front Body Panel Install
9
Fasten Rear Body Panel Install
9
Leveling
Leveler Adjustment
10
Shim The Case
10
Joining
Parts List
11
Q3-MV-BC Case Adjustments
12
Joining Preparation
15
Refrigeration 18
Piping
Refrigerant
18
Refrigerant piping
18
Line Sizing
18
Oil Traps
18
Refrigeration Spec Sheets
19
Table of Contents
Electrical 20
Electrical Info
Merchandiser Electrical Data
20
Electrical Connections
20
Field Wiring
20
Identification of Wiring
20
Remove Rear Raceway
21
Electrical Conduit (Electrical Box)
21
Electrical Wiring Diagram
22
Miatech Fogging System
27
Setup and Installation
Fogging System Mounting
28
Fogger Nozzle Install
28
Water and Air Hose Routing
30
Case Settings
31
Miatech Controller Settings
31
Reverse Osmosis Filter
31
Field Electrical Connections
32
System Clock
34
Fogger System Troubleshooting
37
User Information
38
General
Start Up
38
Load Limits
38
Maintenance
Case Cleaning
41
Exterior Surfaces
41
Interior Surfaces
41
Troubleshooting
43