Product should always be maintained at proper
temperature. This means that from the time the
product is received, through storage, preparation
and display, the temperature of the product must
be controlled to maximize the life of the product.
UNCRATING
Move the merchandiser as close as possible to its
permanent location. Remove the top of the crate
and detach the walls from each other. Lift crate
from the skid. Unbolt the case from the skid. The
fixture can now be lifted off the crate skid.
Lift
only at base of skid!
Remove any braces and/or
skids attached (blanket wrapped merchandisers
may have skids). Always check for damage
before discarding packaging.
EXTERIOR LOADING
Do NOT walk on top of merchandisers
or
damage to the merchandisers and serious
personal injury could occur. T
HEY ARE NOT
STRUCTURALLY DESIGNED TO SUPPORT EXCESSIVE
EXTERNAL LOADING
such as the weight of a
person. Do not place heavy objects on the
case.
LEVELING AND JOINING
Since ends are an integral part of these models,
and re-joining sectional models is part of setting,
there are no separate end or joining instructions
for this family. Sections are sometimes referred to
as split cases, or end and center cases.
The sectional construction of models 16 ft
(4877 mm) or longer enables them to be shipped
in two sections and to be re-joined easily at the
job site.
Some models, 16 ft (4877 mm) or less, are
shipped as one section and are not re-joined.
A
JOINT TRIM KIT
is supplied when appropriate to
cosmetically mask the sectional joints. This
involves applying a vinyl strip to the top of the
center air discharge (CAD).
Merchandisers must be installed level to ensure
proper operation of the refrigeration system and
to ensure proper drainage of defrost water.
It is
imperative that cases be leveled from front to
back and side to side prior to joining. Leveling
the case correctly will solve most operating
problems.
1. Check floor where cases are to be set to see if
it's level. Determine where the highest part of
the floor is. Cases will be shimmed off this
point. Using case blueprints, measure off and
mark on floor the exact dimensions of the
case footprint. Snap chalk lines for front and
back position of base rail. Mark location of
each joint front and back. Use a transit to find
the highest point along both lines. Mark the
difference, then place the appropriate number
of shims required to maintain high-point
level.
P/N 0446551_A
WWW
.
HUSSMANN
.
COM
Do NOT remove shipping crate until the
case is positioned for installation.
WARNING
!
Do not walk or put heavy objects on case.
CAUTION
!