4. TESTING & OPERATION
4-1
Operation Symbols
Variable adjustment
High speed
(pressure)
Clockwis
e:
1
HIGH
revolution
11
Countercloc kwi se:
pressure increase
pressure decrease
2
LOW
Low speed
12
Electrical
Revolution
control box
3
Forward
13
THREADS
Imperial threads
revolution
N
4
□
Neutral gear
14
mm
Metric threads
5
Reverse revolution
15
mm
Auto feeding
Rate per
revolution
6
Feeding
16
Pump
7
T
Intermittent
17
GREEN
Power switch-ON
button
8
Cross feeding
18
RED
Power switch-OFF
9
Longitudinal
19
OIL
Oil inlet (hole)
feeding
10
Cone clutch
10
Summary of Contents for HU 480 X 2200 VAC TOPLINE
Page 1: ...L A T H E MODEL HU 480 X 2200 VAC TOPLINE...
Page 5: ...1 INVERTER TRANSMISSION LATHE 1 1 Machine Assembly 4...
Page 33: ...7 4 Lubrication Location A Oil input hole B Oil drain hole 32...
Page 37: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 75: ...HU 480 x 2200 VAC TOPLINE...
Page 76: ......