SECTION 5 | OPERATION
5.1 | Pre-start Inspection
Before use each day or at the beginning of each shift, the machine shall be given a visual inspection
and functional test. Repairs (if any) must be made prior to operating the machine, as it is critical to
ensure safe operation of the machine. A checklist for pre-start inspection can be found in the back
of this manual.
5.2 | Controls
Figure 7: Base Controls
Item Control/Indicator
1
Master Power Switch
Operation described as follows
2
Battery Charger Indicator Lights
Item
Control/Indicator
1
Up/Down Rotary Switch
Operation described as follows
2
Emergency Stop
Operation described in Section 2.4
3
Overload Indicator Light
4
Battery Voltage Meter
5
Lift Enable Button
Operation described as follows
6
Alarm Sounds for descent, overload
M
DETAIL M
SCALE 1 : 6.5
1
2
1
2
3
4
5
6
Figure 8: Platform Controls