![background image](http://html1.mh-extra.com/html/hy-gain/hg-54hd/hg-54hd_manual_2190775011.webp)
Pour concrete carefully into hole. Make
certain base assembly maintains the proper
clearance from the outside edges of the hole.
Refer to Figure 9.
The concrete shall be designed to provide a
minimum 28 day strength of 2000 PSI and
shall contain not more than 71/2 gallons of
water per sack of cement.
After the concrete is poured, check base as-
sembly, making sure it is level and it hasn't
shifted during the pour.
TO-0130-8-
If the base is not level, tap the ears of the base
with a hammer to level.
Let the base cure for at least one week before set-
ting up tower!
Set your tower on the hinged side of the base,
align the bottom holes of the tower with the
bottom holes in the base assembly. Install a
single 3/4" bolt in each of the two parallel
b
10
LETTER
PRODUCT 130-1
DIMENSION
A
72"
(1829 mm)
B
83/4
11
(222 mm)
C
6"
(152 mm)
D
351/4
11
(895 mm)
E
34
11
(864 mm)
F
12" overlap (min.)
(305 mm)
G
14"
(356 mm)
H
10"
(254 mm)
TO-0130-0-
1
Summary of Contents for HG-54HD
Page 1: ...HG 54HD 54 Foot Self Supporting Tower ...
Page 2: ......
Page 3: ...Overall View of HG 54HD Tower ii ...
Page 5: ......
Page 7: ......
Page 12: ......
Page 14: ......
Page 18: ......
Page 19: ......