Performing maintenance
LVU-CD-40 /-T001
en(us)
Page 43 / 52
BeWa LVU-CD-40-T001 4142242a en-us 2016-05-13.doc
2016-05-13
19. Bleed the filtration unit.
A
20. Bleed the coalescing housing through
the air-vent plug (2310) at the cover.
21. The replacement of the coalescing
element is completed.