Starting up the OLF
Proceed as follows for commissioning:
Step
Description
1.
Switch the OLF on
2.
Check the suction and pumping power
3.
-> a. If the pump transfers the medium
-> proceed to
Step 4
-> b. If the pump is not pumping medium after ~ 2 minutes,
switch off the OLF. Fill the pump via the suction line
-> proceed to
Step 1
4.
Commissioning successfully completed
For OL5 5/4, please note:
If the pump is not pre-filled and has an operating viscosity
< 200 mm²/s, the unit only reaches the maximum flow rate of 4 l/min
after ~ 10 minutes.