Performing maintenance
8. Check the O-ring (10.2) for damage, and
replace it if necessary.
Position the middle container part and
tighten the tensioning clamp with max.
20 Nm.
9. Push on the quick-action coupling (2) of
the supply line until the ring (1) engages
visibly/audibly.
13. Connect the electrical connector and the
phase boundary sensor together and
secure them by rotating clockwise.
OLSW
en(us)
Page 60 / 76
BeWa OLSW 4268435 en-us 2017-11-09.docx
2017-11-09
Summary of Contents for OLSW
Page 63: ...Finding spare parts OLSW en us Page 63 76 BeWa OLSW 4268435 en us 2017 11 09 docx 2017 11 09 ...
Page 74: ......
Page 75: ......