Titan 575 Owner’s Guide: 40
Re-Installing Manifold
1. Position the outer plungers at the same position (see Figure 16).
2.
Re-install manifold and torque the fasteners in an “X” pattern to 50% of specification
and then retorque to 100% specification (see Figure 17 and Figure 18).
1
3
4
2
5
8
7
6
1
3
4
2
5
8
7
6
Figure 16. Re-install Manifold and Torque Fasteners
Figure 17. Torque Sequence in
“X” Pattern
Figure 18. Torque Bolts to 22
ft. lbs
Summary of Contents for Titan 575
Page 2: ......