27
Maintenance
Proper maintenance is required to keep the MX3-500HE operating properly, prevent
downtime and to extend the life of your equipment.
This machine is an electrical appliance.
Care must be taken to reduce the risk of electrical shock.
Disconnect electrical power before performing any service or
maintenance inside machine base or before testing or repairing switches or power
cords. Failure to do so may result in severe personal injury or death.
OPERATION
INTERVAL Page #
CLEAN CHEMICAL FEED FILTER & FOOT VALVE Daily – After Each Job
28
CLEAN VACUUM SHUTOFF ASSEMBLY SCREEN
Daily – After Each Job
28
CLEAN HYDRO-FILTER II
Daily – After Each Job
29
RINSE OUT RECOVERY TANK
Daily
29
CLEAN WASTE PUMP-OUT PUMP
Daily
30
FLUSH SOLUTION TANK AND PUMP
Daily
30
CLEAN PUMP-INLET FILTER
Weekly – As needed
31
FLUSH CHEMICAL SYSTEM
Monthly
32
LUBRICATE REGULATOR PISTON SEAL
Monthly
33
CLEAN DRAIN VALVE
As needed
34
STORAGE PREP – FREEZE PROTECTION
As needed
35
Section
3
Summary of Contents for Nautilus MX3-500HE
Page 1: ...1 LMANN18 REVISED 01 29 2015 MX3 500HE Nautilus Operating Manual ...
Page 39: ...39 OPTIONAL AUTO FILL FLOAT VALVE ASSEMBLY NM5740 ...
Page 40: ...40 Optional Pump Out Pump AP37F PARTS ASSEMBLY ...
Page 41: ...41 2 4 4 6 7 10 11 3 8 9 3 5 1 8 9 8 9 2 39 12 8 9 ...
Page 48: ...48 2 39 1 72 73 73 67 9 30 31 82 83 2 83 82 84 INSIDE SOLUTION TANK BOTTOM VIEW SOLUTION TANK ...
Page 50: ...50 96 91 97 9 88 111 94 105 93 OPTIONAL PUMP OUT CONNECTIONS 99 95 118 ...
Page 51: ...51 FLOW 81 92 91 99 96 9 97 105 13 14A 14 95 OPTIONAL PUMP OUT PARTS 1 39 97 9 118 ...
Page 52: ...52 HEATER PARTS 42 42A 98 114 110 71 113 114 ...