Installation and Operation:

1. Remove cabinet cover. Install the short, white inner discharge tubes on the outlets of the eductors. They go over the

smaller barbed parts on the bottom of the eductors. These tubes must be in place for the eductors to function. The
 inner discharge tube for the 3.5 GPM (yellow) eductor has a yellow flooding ring inside it. The inner discharge tube
for the 4 LPM (grey) eductor has a grey flooding ring inside it. Install the end of the tube nearest the flooding ring on
the eductor's inner discharge  barb. 

To ensure the IDTs are on correctly, the metal rings must be above the small

barbs.

2. Drill holes for the three wall anchors with a 6mm drill bit, using the cabinet back as a template for correct spacing of

the mounting screws. Install mounting anchors, and then screws in top two anchors. Slide key holes in cabinet back
over screw heads, tighten screws, then install bottom screw. Do not mount more than 1.8 metres above the bottom
of the concentrate container, or below the highest concentrate level (never mount concentrate higher than the
proportioner).

3. Select metering tips (up to 4) for the selector valve (see next two sections). Push each tip firmly into a separate hose

barb extending from the selector valve. A tip with no hole (clear plastic color) can be used to block any valve port not
being used. (This may be used for dispensing water only.)

4. Cut tubing supplied for chemical inlet (6mm ID) into lengths required so that tubes reach from barbs on selector valve

to bottom of concentrate containers. For each inlet tube, slide a weight over one end and slip end over the barb on
a footvalve. Slide weight down to foot valve and attach opposite end of each tube over one of the hose barbs on the
selector valve.

5. Slide tubes from each side through the notches in the cabinet.
6. Place footvalve ends of supply tubes into concentrate containers. REMEMBER TO CHECK FOOT VALVE

STRAINERS PERIODICALLY FOR CLOGGING: CLEAN IF NECESSARY.

7. A short discharge tube is used with a 4 LPM (grey) eductor – Model 3875GBA-2 ; minimum tube length is 20 cm

for correct operation. A longer tube (1.2m) is used with a 14 LPM (yellow) eductor – Model 3874GBA-2. Slide end
of tube over inner discharge tube and onto eductor discharge outlet. The hose hook supplied with Model 3874GBA-
2 may be installed on the long tube to allow it to hang from dispenser when not in use.

8. Replace cabinet cover. Push the sides in, behind the latch holes, to snap the cover in place. The two screws provided

may be installed in the holes in the cabinet sides to prevent easy removal of cover.

9. Connect water supply hose of at least 13mm ID to water inlet swivel. (Minimum 1.76 Bar pressure, 

with water

running

, is required for correct operation.) Connect opposite end of hose to water supply. Turn water supply on.

10. Purge air from the system by pressing the buttons briefly. There may be some water discharge from the eductor vents

until the air is purged.

11. Push button to start flow of desired water/concentrate solution, and hold until supply tube is primed (filled). Then push

the button whenever dispensing is required, and release button to stop flow of solution. If you wish to be able to lock
the button in the "on" position: Clip or bend the two tabs behind the lower front  portion of the button. (Seediagram
below.) This allows the button to be fully depressed and allows it to latch in the "on" position. 

TO UNLOCK, PULL

THE BUTTON OUT!

12.

It is essential that the discharge hose is not obstructed. If discharge is restricted, water will flow out of the
eductor vents. Do not start to operate the dispenser with liquid in the discharge tube.

AccuDose

 3874GBA-2 & 3875GBA-2

with HydroGap

TM 

Air Gap Eductors

Package Contains:

1. Proportioner unit.
2. Chemical inlet tubing .
3 Foot valves (4) and

weights (4).

3. Discharge tube.
4. Metering tip kit.
5. Mounting hardware.
6. Hook for discharge tube

(Model 3874GBA-2 only).

7. Instruction sheet.

Clip or
bend
these
tabs to
depress
button
into locked
position.

Summary of Contents for AccuDose 3874GBA-2

Page 1: ...REMEMBER TO CHECK FOOT VALVE STRAINERS PERIODICALLY FOR CLOGGING CLEAN IF NECESSARY 7 A short discharge tube is used with a 4 LPM grey eductor Model 3875GBA 2 minimum tube length is 20 cm for correct operation A longer tube 1 2m is used with a 14 LPM yellow eductor Model 3874GBA 2 Slide end of tube over inner discharge tube and onto eductor discharge outlet The hose hook supplied with Model 3874GB...

Page 2: ... is grey a 14 LPM eductor is yellow Refer to parts diagram if unfamiliar with names of system components Measurement of Concentration You can determine the dispensed water to product ratio for any metering tip size and product viscosity All that is required is to operate the primed dispenser for a minute or so and note two things the amount of dispensed solution and the amount of concentrate used ...

Page 3: ...arge tube b 10070470 14 LPM inner discharge tube 13 a 10064794 4 LPM outer discharge tube b 10077315 14 LPM outer discharge tube 14 10080720 Hose hook dark grey std 10080721 Hose hook sky blue 10080722 Hose hook red 10080723 Hose hook green 10080724 Hose hook light grey 10080725 Hose hook yellow Hose hook provided with Model 3874GBA 2 only 15 10080920 Selector valve replacement kit e Suction stub ...

Page 4: ...nsure inner discharge inner discharge tube tube is installed and has flooding ring e Concentrate container empty e Replace with full container f Inlet hose barb not screwed f Tighten but do not overtighten into eductor tightly g Clogged water inlet strainer g Disconnect inlet water line and clean strainer h Selector out of position h Ensure selector is in position desired 3 Excess concentrate draw...

Reviews: