background image

Safe-T-Cover 

1-800-245-6333 

HCF300TDS-

2

 

2. 

 

Using four (4) hexhead screws for each section, assemble both "A-B" sections thru holes 
provided and set on marked concrete base (FIG 2). 

 
 
3. Set "D" (roof) panel on "A-B" sections and using four (4) hexhead screws fasten thru holes 

provided. 

 
4.   A.  Using one (1) hexhead screw attach 

Outside Corner Anchoring Brackets

 to "A-B"             

sections. Fasten bracket to concrete using one anchor for each bracket (FIG 1A). 

 

B.  Square the “A-B” corners. Align the “B” panels so that they form a straight line.  Using 
one (1) hexhead screw and one (1) hit pin for each bracket attach 

Inside Anchoring 

Brackets 

to "B" panels  and concrete (FIG 1B). 

 

C.   Insert 

Inside Roof Clips

 in "D" (roof) panel.  Using one (1) hexhead screw in each clip 

attach clip to "B" (side) panel (FIG 1C). 

 

 

 
 
5. Set "C' panels and lock in place.  

(Solid "C" panel to be ACCESS door).

 

 
6. Provide ground-fault interrupter device in electrical circuit according to applicable codes.  

Install heater as per manufacturer's instructions and governing local and national codes. 

 
7. For maximum protection it is suggested that the area between the bottom of the enclosure and 

the concrete base be caulked with the exception of the "C" panels.  

DO NOT CAULK THE 

BOTTOM OF THE "C" DOOR PANELS. 

 
 
 

Reviews: