HydroHoist, LLC
: HYDROPORT
®
EPIC
®
and EXTREME
®
Installation Manual
9
SECTION
2
—
3
INSTALLATION
-
Fixed Dock
Alternate Installation Using The Riser Bracket
A.
Flush mount the Angle on the top of the
dock and secure to dock as required.
B.
Align the two holes in the Riser Dock
Bracket with the holes in the Angle at
the desired height and secure with
3/8”
Bolts, Lock Washers and Nuts.
C.
Drill two
3/8”
holes into the dock face
and attach the Riser Dock Bracket to the
dock face using
3/8”
Bolts, Lock Washers
and Nuts.
D.
Repeat step
“
A
”
so that both port and
starboard Dock Brackets are centered
with the Mooring Brackets on your
HydroPort.
E.
Continue following the instructions on
SECTION 2
-
2
For typical Fixed Dock In-
stallation.
Polyethene expands and contracts
with the temperature. Check the
Mooring Bracket spacing on your
HydroPort before determining the
exact spacing of the Dock Brackets.
Hardware Required
Item #
AX Part #
HH Part #
Description
QTY
3
1033277
2090503
BOLT
-
HEX HEAD 3/8
-
16 X
1
-
1/2”
GALV
8
4
1033280
2090704
WASHER
-
LOCK
3/8”
GALV
8
5
1033273
2090107
NUT
-
HEX
-
3/8
-
16 GALV (16.0#/M)
8
Parts Required
Item #
AX Part #
HH Part #
Description
QTY
1
1044876
3151500
RISER DOCK BRACKET
2
2
1042720
3151600
ANGLE
2
E
Top of dock
2
1
Lag Bolts
E
B
C
1
A
2
3
4 & 5
IT IS UP TO THE INSTALLER TO DETERMINE IF THE ATTACH-
MENT IS STRONG ENOUGH. ADDITIONAL REINFORCEMENT
MAY BE NECESSARY IN ROUGH WATER.