Page 4
7.1 Electrical installation approach .......................................................................................... 27
7.2 Cable connections ............................................................................................................. 28
7.3 Safety interlock .................................................................................................................. 28
7.4 Connection diagram .......................................................................................................... 29
7.5 Electrical installation check list .......................................................................................... 29
8. Commissioning ................................................................................................................. 30
9. Maintenance ....................................................................................................................... 31
9.1 General .............................................................................................................................. 31
9.1.1 Service messages .......................................................................................................... 31
9.1.2 Service messages for preventive maintenance .............................................................. 31
9.2 Safety instructions for maintenance .................................................................................. 32
9.3 Maintenance frame work when unit is operated with fully demin. water and condensate . 33
9.4 Maintenance when unit is operated with tap water or partially softened water ................ 33
9.5 Removal and reinstallation of the steam cylinder .............................................................. 34
9.5.1 Removal of the steam cylinder ....................................................................................... 34
9.5.2 Cylinder cleaning / O-ring replacement .......................................................................... 35
9.5.3 Cleaning the connecting hoses, base connections, fine filter and drain pump ............... 36
9.5.4 Level control device cleaning ......................................................................................... 37
9.5.5 Cleaning the vent hole on the pipe elbow ...................................................................... 37
9.5.6 Reinstallation of the steam cylinder ................................................................................ 38
9.6 Removal and installation of unit components .................................................................... 39
9.6.1 Blow-down pump (removal, cleaning, reinstallation) ...................................................... 39
9.6.2 Solenoid valve (removal, reinstallation) .......................................................................... 40
9.6.3 Heater element replacement .......................................................................................... 41
9.6.4 Thermo switch replacement (for heater elements) ......................................................... 41
9.6.5 Releasing a thermo switch that has triggered ................................................................ 42
9.6.6 Inspection of wiring connections and heater element wiring .......................................... 42
9.7 Leak test ............................................................................................................................ 43
9.8 Functional check ............................................................................................................... 43
9.9 Finishing maintenance ..................................................................................................... 43
10. Dismantling ...................................................................................................................... 44
11. Declaration of Conformity .............................................................................................. 45
12. Spare Parts ...................................................................................................................... 46
13. Technical specifications ................................................................................................. 52
14. Exploded view ................................................................................................................. 54
15. View of housing ............................................................................................................... 55
Summary of Contents for FlexLine FLH03
Page 1: ...FlexLine Electric Heater Steam Humidifiers ÁFLH ENKÈ FLH EN E 8881164 Manual ...
Page 45: ...Page 45 11 Declaration of Conformity ...
Page 49: ...Page 49 This page intentionally left blank ...
Page 50: ...Page 50 This page intentionally left blank ...