Installation, Programming and Maintenance User Guide Oxymatic Smart
V. 1.3.2. May 2015
11
5.
OXYMATIC’S SYSTEMS INSTALLATION
5.1
PLUMBING
The plumbing is a very important aspect to consider for installing Oxymatic system, therefore a priority
to have a good installation. As can be seen on the chart is important to install the camera after filtering
circuit and heating.
The chamber is installed as a by-pass on the pool’s return line at the filter outlet. All pool-water will
pass through the chamber, where the operating titanium electrode continually generates hydroxyl ions.
This will have the effect of raising the pool-water’s ORP to the technical limit of the system.
Taking into account that the titanium electrodes should be installed at the entry of the water and the
copper electrodes to the exit of the water. Depending on the Oxymatic model, we will connect the
injection of pH, chlorine or peroxide.
Instal the chamber as a by-pass at the filter outlet, taking account of the directions of the arrows. The
equipment is compatible with PVC adhesives.
Chamber with Copper Electrodes