Page 32
Step 5: Monitor unit function and check
for leakage
»
Let the high-pressure nozzle system
operate for about 30 minutes with
the duct ventilator running for
humidity transport.
»
If leaks appear, switch off the unit.
Step 6: Repair leaks and correct improper
spray image
»
Re-work hosing and distribution tube
connections, if required.
»
When nozzles drip, check presence
and correct seating of o-rings.
»
When spray image is unsatisfac-
tory, clean nozzles in ultrasonic bath
as described in the maintenance
section.
»
Repeat actions until everything is
o.k..
Step 7: All electrical functions must be
executable
»
Run through menus and verify sys-
tem control functions
End of Commissioning.