Page 21
5.5.3 Connecting the control valve to the optional
mounting block
After installation of the optionally available mounting block (Arti-
cle no. E-5000072),
water
inlet and water outlet valves must be
closed in the first step and the by-pass valve must be open in
order not to break house installation raw water supply. The set
screw for blending fine-dosing must be screwed in fully clock-
wise (blending valve closed).
»
Use adequate hoses incl. flat gaskets to connect water
inlet and water outlet of the control valve to the house
water installation. Make sure to pay attention to the flow
direction arrows on the control valve indicating water
inlet and water outlet
»
Open water inlet valve on mounting block while the
valve in the middle remains closed (by-pass still open).
Now drinking water is fed to the softener device via the
mounting block
»
Check all connections for leakiness
Please note:
The water outlet valve of the mounting block must
not be opened prior to start-up of the softener system in order
not to allow any water from the softener to enter the house
installation before clean soft water is produced.
5.6 Connecting of brine tube
The brine tank comes with a brine tube already connected on
one side. The free ending of the brine tube is to be connected to
the corresponding control valve connection.
»
Open connecting nut on the control valve and slide nut
onto brine tube
»
insert brine tube into elbow connector on control valve
»
Screw-on connecting nut only hand-tight
Please note:
Keep brine tube as short as possible
Please note:
In case of the optional chlorine cell to be used, the
t-piece delivered with the cell must be implemented in the brine
tube for adaptation of the electrodes. For details, see the accord-
ing chapter of this manual .
5.7 Make waste water connection
»
Disconnect connecting nut from control valve waste
water elbow and push onto PVC waste water hose pro-
vided with the system. The hose end holds a inner
detonator shell for stabilizing purposes.
Inlet valve
By-pass valve (open)
Outlet valve
Set screw
(closed)
to
from
Softener device
By-pass setting of the optio
optionalen Anschlussarmatur
(closed)
(closed)
Inner detonator shell
Summary of Contents for WaterLine Double
Page 43: ...Page 43 This page intentionally left blank ...
Page 44: ......