Seite 37
»
Attach the control device to a wall or a suitable mount.
A mains socket 230VAC/50 Hz is required in the near-
by
»
Connect the other end of the electrode cable to the con-
trol device
10.3 Setting-up the control device
On the front panel of the control device a 4-step set screw allows
for the adaptation of the chlorination extent to the resin volume
used.
The information given in the table below may only be regarded
as guide values:
In case of raw water hardness beyond 30 °dH setting „4“ or „6“
should be used.
10.4 Operating
Operating is started when the power adapter is plugged into the
mains socket. The system is then in stand-by. The green power
LED is on as long as the mains connection is not disrupted.
Three operating cycles may be distinguished (see table below)
In case of a break of mains supply the current cycle will termi-
nate.
10.5 Chlorine cell maintenance
The electrode bracket should be disassembled approx. every 6
months and be rinsed with warm water. Any visible salt deposit
must be removed.
Set screw position
0
2
4
6
max. resine volume [l]
50
100 200 300
Operating
cycle
Function
Service LED
state
Stand-by
Conductivity is monitored
lights up every
30 secs.
Service
chlorination
Resin bed is desinfected
permanently on
Service blocked Desinfection terminated.
No further desinfection
within the nex 120 mins.
continously flas-
hes for 120
mins.
Control device
Service-
LED
Set
screw
Power
LED
Summary of Contents for WaterLine Double
Page 43: ...Page 43 This page intentionally left blank ...
Page 44: ......