INSPECTION
CHARGING OUTPUT CHECK
Start the engine and keep it running at 5,000 rpm.
Using the pocket tester, m e a s u r e the DC voltage
between the battery terminal
and
.
If the tester reads under 14.0 V or over 15.0 V, check
the magneto no-load performance and regulator /
rectifier.
MAGNETO NO-LOAD PERFORMANCE
Disconnect the three lead wires from the magneto
terminal.
Start the engine and keep it running at 5,000 rpm.
Using the pocket tester, measure the AC voltage
between the three lead wires.
If the tester reads under 67 V or over 99 V the magneto
is faulty.
14.0
15.0 V (at 5,000 rpm)
Standard charge
Regulator
Rectifier
DCV
Battery
IG. switch
Pocket tester : 09900-25002
CAUTION
When making this test, be sure that the battery is
full-charged condition.
5-9 ELECTRICAL SYSTEM
67
99 V (at 5,000 rpm)
Standard NO-load perfor-
mance of magneto
Summary of Contents for 2002 Comet 125
Page 1: ...SERVICE MANUAL 99000 94710 SERVICE MANUAL HYOSUNG MOTORS MACHINERY INC ...
Page 5: ...NOTE Difference between photographs and actual motorcycles depends on the markets ...
Page 13: ...EXTERIOR ILLUSTRATION 1 7 GENERAL INFORMATION ...
Page 96: ...CARBURETOR FUEL SYSTEM 4 4 ...
Page 118: ...LAMP HEADLAMP TURN SIGNAL LAMP TAIL BRAKE LAMP Front Rear ELECTRICAL SYSTEM 5 16 ...
Page 138: ...FRONT FORK CHASSIS 6 14 ...
Page 144: ...FRONT FORK CHASSIS 6 20 ...