MAINTENANCE
5-4
HySpeed HT2000LHF
Instruction Manual
7
Initial Checks
Before tracking down specific problems, it is good practice to do a visual check, and verify proper voltages are
present at the power source, transformer and power distribution board.
1. Place the line disconnect switch in the off position.
2. Using a Phillips head screwdriver, remove the top plate, two side plates, front plate, and rear plate.
3. Inspect the interior of the power supply for discoloration on pc boards, or other apparent damage. If a
component or module is obviously defective upon visual inspection, remove and replace it before testing.
Refer to
Section 6
to identify parts and part numbers.
4. If no damage is apparent, place the line disconnect switch in the on position.
5. Measure the voltage at TB1 between L1, L2 and L3. Refer to Figure 5-2 for detail of TB1. The voltage between
any two of the three points at TB1 should be equal to your supply voltage. If there is a problem at this point,
disconnect the main power and check connections, power cable, and fuses at the line disconnect switch.
Repair and/or replace defective component(s) if necessary.
WARNING
SHOCK HAZARD: Always use caution when servicing a power supply when it is plugged in and the
covers are removed. Dangerous voltages exist within the power supply which could cause injury or
death.
Measure the voltage for the 400 volt CE power supplies between the U, V and W
terminals of TB1 in the EMI filter located on the top of the power supply. Refer
to the appendix section.
Figure 5-2
Primary Power Measurement Location – HT2000LHF
WARNING
There is line voltage at the contactor if the line
disconnect switch is in the ON position, even if the
ON (1) pushbutton on the HT2000 power supply has
not been pressed. Use extreme care when
measuring primary power in this area. Voltages
present at the terminal block and contactor can
cause injury or death!
Summary of Contents for HT2000LHF
Page 1: ...200 Volt Plasma Arc Cutting System Instruction Manual 803040 Revision 7 HySpeed HT2000LHF ...
Page 5: ......
Page 15: ...TABLE OF CONTENTS viii Hyspeed HT2000LHF Instruction Manual 6 ...
Page 109: ...MAINTENANCE 5 20 HySpeed HT2000LHF Instruction Manual 7 ...
Page 133: ......
Page 134: ...7 5 7 Figure 7 1 HT2000LHF Coolant Flow Diagram ...
Page 135: ......
Page 136: ...7 7 7 ...
Page 137: ......
Page 138: ...7 9 7 ...
Page 139: ......
Page 140: ...7 11 7 ...
Page 141: ......
Page 142: ...7 13 7 ...
Page 143: ......
Page 144: ...7 15 7 ...
Page 145: ......
Page 146: ...7 17 7 ...
Page 147: ......
Page 148: ...7 19 7 ...
Page 149: ......
Page 150: ...7 21 7 ...
Page 151: ......
Page 152: ...7 23 7 ...
Page 153: ......
Page 154: ...7 25 7 ...
Page 155: ......
Page 157: ......
Page 159: ......
Page 174: ...APPENDIX A ARGON HYDROGEN CUTTING AND GOUGING a 14 HySpeed HT2000LHF Instruction Manual 6 ...
Page 176: ...b 2 ...
Page 177: ...b 3 ...
Page 178: ...b 4 ...
Page 179: ...b 5 ...
Page 181: ...b 7 ...
Page 182: ...b 8 ...
Page 183: ...b 9 ...
Page 184: ...b 10 ...
Page 194: ...APPENDIX E AIR FILTERS e 2 Hyspeed HT2000LHF Instruction Manual 6 ...
Page 196: ...APPENDIX F AERATION MANIFOLD FOR CUTTING ALUMINUM f 2 Hyspeed HT2000LHF Instruction Manual 6 ...
Page 198: ...APPENDIX G IEC SYMBOLS g 2 Hyspeed HT2000LHF Instruction Manual 6 ...