Full-Length Machine Torch Part Replacement Procedures
5
70
810460
Service Parts and Procedures
SmartSYNC
3.
Install the torch-lock switch connector into the receptacle. Put the blue and black torch-lock
switch wires into the notch in the RF torch PCB. Refer to
4.
Install the wires into the 2-pin receptacles on the RF torch PCB. Refer to
for location.
a.
Push both wires of the cap-sensor switch into the 2-pin receptacle at the same time.
b.
Push both red RF wires into the 2-pin receptacle at the same time.
5.
Install the 6-wire connector into the receptacle on the RF torch PCB. Refer to
page 70 for location.
Figure 11
– RF torch PCB connections for full-length machine torch
5
1
2
3
4
6
6
1
6-wire connector
2
2-pin wire receptacle
3
Blue and black cap-sensor switch wires
4
Red RF wires
5
Notch in the RF torch PCB
6
Torch-lock switch connector
Summary of Contents for SmartSYNC 059719
Page 1: ...SmartSYNC Torches Service Parts and Procedures Guide 810460 REVISION 0 ENGLISH ...
Page 10: ...10 810460 Service Parts and Procedures SmartSYNC ...
Page 12: ...Before You Begin 1 12 810460 Service Parts and Procedures SmartSYNC ...
Page 42: ...Prepare to Do the Part Replacement 3 42 810460 Service Parts and Procedures SmartSYNC ...
Page 62: ...Hand Torch Part Replacement Procedures 4 62 810460 Service Parts and Procedures SmartSYNC ...
Page 96: ...Torch Lead Replacement Procedures 7 96 810460 Service Parts and Procedures SmartSYNC ...
Page 98: ...Do a Check of the Torch Assembly 8 98 810460 Service Parts and Procedures SmartSYNC ...