7251 / 7351 Slide Gate Operator
INSTALLATION AND PROGRAMMING MANUAL
11
MX4514 Rev. A ©2019
www.hysecurity.com • 800-321-9947
Below is a list of tools and materials necessary for installation of the control box:
• Wire cutters/strippers
• Basic hand tools (screwdrivers, pliers, etc..)
• 5/16” and 3/8” wrenches
• Bubble Level
• Drill and assorted size bits
• Electrical conduits, grommets, asphalt patch, etc. as needed
• Excavation tools for installing posts and mounting pad
• Concrete (for pad)
• Two 3” width posts long enough to provide a stable 24” height above ground
• Chain breaking tool
IMPORTANT!
•
The gate operator installation is NOT a “do-it-yourself” project. Contract a qualified gate operator
installation company to install this system to ensure a safe and reliable installation.
•
Property owner is responsible to ensure installer is qualified to make a safe and professional installation.
• Consult local government agencies for up-to-date rules and regulations to satisfy licensing, codes or
regulations that regulate automated gate system design and installation.
•
The gate being modified should be level and plumb and the gate should open easily and evenly.
SECTION 4: INSTALLATION SAFETY
SECTION 5: TOOLS & MATERIALS REQUIRED
The following are required to power the 7251 or 7351 control box:
• 12VDC battery to power the control board
• An AC-to-DC fully automatic charger, a 12-30 VDC power source, and/or solar panel to charge the battery.
Nice offers AC-to-DC converters and solar panel solutions for charging 12VDC batteries. Recommended
battery specifications are as follows:
5.1 CONTROL BOX POWER REQUIREMENTS
RECOMMENDED 12VDC BATTERY SPECIFICATIONS
12 Volt DC Output
Sealed lead acid starter battery
Terminal posts on top (not sides)
35 AMP hours or larger for AC charging applications
70 AMP hours or larger for Solar charging applications & Longer Backup