The installer and customer must each ensure that all of the following actions have been completed.
•
Left box is for installer check off and the right box is for customer check off.
INSTALLATION CHECKLIST
The gate has been checked to make sure it is level and moves freely in both directions.
Potential pinch areas have been guarded so as to be inaccessible OR have contact and/or non-contact
obstruction sensing devices installed.
The installer has installed one or more contact or non-contact obstruction sensing devices, in
compliance with UL325 requirements for this installation.
If pedestrian traffic is expected, a separate pedestrian gate has been installed, a minimum of seven
feet from the gate. The customer has been informed that all pedestrian traffic must use the pedestrian
gate.
Warning signs have been installed on each side of the gate in highly visible locations. The customer
has been informed that these signs must remain at all times.
There are no controls installed within 6 feet of the gate.
The installer has properly adjusted the obstruction sensing feature and has tested the gate to make
sure that the gate stops and reverses a short distance with minimal resistance applied (Approximately
40 lbs. on a swing gate), at the end of the gate.
The installer has instructed the customer in the proper use of the gate operator and reviewed all of the
operational functions, obstruction sensing devices, warning beeper and reset, etc.
The installer has instructed the customer in the proper way of disconnecting the operator. Manual
disconnect must never be used while the gate is in motion. The power must be turned off and battery
disconnected before disengaging the operator.
The installer has reviewed all safety instructions with the customer, and has left the safety instructions
and owner’s manual for their reference.
The installer has answered any questions the customer has regarding the operation of the gate
operator and gate operator safety precautions.
The installer has explained to the customer that a regular maintenance schedule for both the gate and
the gate operator is recommended.
The installer has given the control box key to customer and explained to the customer how to manually
open the gate in the event of a loss of power.
18.3 INSTALLATION CHECKLIST