INSTALLER’S CHECK LIST
The following list provides a high level overview of the tasks involved in installing the SwingSmart DC
gate operator. Take a moment to review the list and check off the items as you complete the install.
?
Site Prep - concrete pad location/dimensions, distance from gate, chain height, and
mounting considerations: post or base extension, front or rear installation.
?
Make sure gate installation complies with ASTM F2200 Standard Specification for
Automated Vehicular Gate Construction. And, install the supplied WARNING signs
on both sides of the gate.
?
Check for compliance with local codes, site conditions, and NEC standards.
?
Install operator on concrete pad using four ½ - 13 x 3.5 inch long concrete wedge
anchors.
?
Temporarily attach gate bracket and linkage arm(s).
?
Adjust open and close limit switches through manual operation of the gate.
?
Complete gate arm installation (weld or drill and bolt).
?
Cut the excess off the over extension stop (angle iron) on the SwingSmart arm.
?
Hand-tighten the taper clamp to obtain a tight clutch setting.
?
Install the earth ground and AC wiring connections for AC power.
?
Connect battery wire to switch.
?
Complete Initial Setup Menu programming.
?
Review the connections on the Smart DC Controller.
?
Install Primary/Secondary operator connections, if the site is a bi-parting gate system.
?
Attach accessory devices.
?
Configure the User and Installer Menu options. Program applicable settings dependent
on accessory devices installed.
?
Set the Close Timer (in the User Menu), if necessary.
?
Check the Smart DC Controller software version. If needed, upload the latest version
from www.hysecurity.com. See
"Smart Touch Analyze and Retrieve Tool" on page 102.
.
?
Program changes through the Installer Menu depending on the accessory devices
that you have installed.
?
Give a copy of the operator instructions to the end user. Show the end user how to:
•
Remove the operator cover. Turn the power off and on.
•
Loosen the taper clamp and manually push the gate(s) open & close.
NOTE:
Remember to re-tighten the taper clamp before turning the DC power
switch back on and replacing the covers.
•
Test the red Emergency Stop Button located on the side of the control box. It can
be accessed through a hole in the cover. See Figure 1 on page 23
?
Take photographs of the completed installation site and save it in your business files.
?
Install external entrapment devices as needed.
INSTALLER'S CHECK LIST