OPERATING PROCEDURES
54
The amber lights on the control panel will come on when
both ends of the attachment are in contact with the con-
tainer.
1. INDICATOR FLAG
2. CONTAINER
ATTACHMENT
LOCK PIN ENGAGED
LOCK PIN DISENGAGED
12692
1
2
2
1
FIGURE 7. INDICATOR FLAG
6. Push on the front of the lock pin switch to extend the
lock pins. The green lights on the control panel will come
on when the lock pins are in the engaged position. Make
sure the indicator flags for the lock pins are in the en-
gaged position. See FIGURE 7.
NOTE:
If both lock pins are not engaged, an audible
alarm will sound. Change the position of the container to
allow the pins to engage.
WARNING
DO NOT lift the container unless both lock pins are
fully engaged.
7. Tilt the mast rearward a small amount. Lift the con-
tainer. The amber lights must go OFF. Use the side--shift
function to move the center of gravity of the load to the
center--line of the lift truck.
8. Do not travel with the container higher than necessary
for adequate ground clearance.
9. Move the container.
HOW TO DEPOSIT A CONTAINER
1. Keep the mast vertical when picking up or depositing
the container.
2. Put the container on a stable, even surface or contain-
er.
Property of American Airlines
Summary of Contents for CHALLENGER H165XL
Page 8: ...CONTENTS 6 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Page 10: ...WARNING 8 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Page 112: ...MAINTENANCE 110 P r o p e r t y o f A m e r i c a n A i r l i n e s...
Page 113: ...MAINTENANCE 111 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Page 116: ...2 DO NOT PUBLISH THIS PAGE REFERENCE ONLY P r o p e r t y o f A m e r i c a n A i r l i n e s...