7
SET UP AND PREPARATION FOR OPERATION
1. Log Pusher
2. Work Table
3. Shield
4. Support Leg
5. Switch
6. Motor
7. Pushbutton Box
8. Wheels for Minor Moving
ONLY.
9. Hydraulic Control Lever.
10.Control Lever Guard
13.Bleed Screw
14.Oil Drain Bolt with Dipstick
Installation
1) Install the foot and foot grip under the machine, and secure with screws, seals and
bolts.
2) Install the support plate on the machine by hooking the hooks under the supports
provided for this purpose.
3) Install the work plates on both sides of the machine, align the holes, put the seals and
screws to secure the parts.
4) Install the left cover on the machine (it must be aligned with the holes in the worktable),
and secure with the M8 hex bolts and M8 seals.
5) Install the cover and secure with M8 hex bolts and M8 seals.
6) Install the M8 square-head bolts through the left and right cover installation holes and
the connection plate and tighten the four M8 nuts.
7) Install the protective covers on the front of the unit and the rear cover on the back of the
machine. Carefully push the fasteners into the installation holes of the protective covers
and the rear cover, then carefully insert the fasteners into the mounting holes in the right
and left covers.