www.hyundaipowerproducts.co.uk
26
Operation
Stopping Procedure
1. Turn the power switch to “OFF” position and unplug the power cord.
Restarting Procedure
1. Wait 10 seconds after shutting off the heater.
2. Turn the power switch to “ON” position.
3. Be sure to follow all starting procedure precautions.