7-65
Convert the automatic / manual switch to
manual.
The automatic/manual switch is located in
the lower left part of the PCB
Be sure to check if battery connector is
separated in advance.
MG/SW operation
(This switch is operated automatically.)
Check the charging voltage soft start
function (refer to the monitor)
After 5 seconds next to turn the manual
switch on.
Input, floating charge and red charging
condition lamp is on.
After 15 seconds next to turn the manual
switch on.
Yellow charging condition lamp is on
while charging.
After green lamp becomes on, measure
the output voltage of the battery
connector by multi measure. If measured
voltage is between 62.5V ~ 63.5V, it is
normal. (Rated voltage : 63V)
After 30 seconds next to turn on the
manual switch, if buzzer rings for 10
seconds and END lamp is on, it is under
normal condition.
When yellow lamp under charging
condition is on after 1~2 times
repetition, convey the automatic/
manual switch to the automatic and
check if the charger trips automatically.
BR7BAT08
BR7BAT09
BR7BAT10
Η
Ι
Θ
(4)
(5)
(6)
Η
Θ
Ι
Κ
ö