5-29
STACKING
STACKING
To put a load on a stack
To put a load on a stack
7)
7)
(1)
(1)
Aproach slowly and align the lift truck and load squarely with
the stack.
①
Raise the load as the lift truck nears the stack.
②
Move forward slowly until the load almost touches the stack.
The leading edge and sides of the load pallet should line up
exactly with the near edge and side of the load or rack on
which you are stacking.
③
Stop close to the stack and further lift the load high enough to
clear the top of the stack. Slowly move the load into position.
Use care not to damage or move adjacent loads.
When the load is aligned with the stack beneath it, tilt the mast
to the vertical position and carefully lower the load onto the top
of the stack.
④
⑤
Lower the forks slightly to clear the load pallet. Tilt the forks
forward slightly, if necessary.
⑥
D35AOM137
D35AOM138
D35AOM139
D35AOM140
D35AOM141
Check your travel path, then carefully back away until the forks
are clear of the stack. Stop and lower the forks to the travel
position [150~200 mm (6~8 in) above the ground], then tilt back
for travel.
⑦
D35AOM142