User manual
14
During
the
generator
sets
group
running,
please
keep
watching
to
avoid
the
generator
sets
group
stop
running
because
of
individual
generator
set’s
malfunction.
3.6
Operation
for
control
system
3.6.1
Generator
control
panel
operation
Our
generator
set
standard
supply
two
different
control
module:
one
is
single
generator
with
remote
start
function,
the
other
is
single
generator
with
Automatic
Mains
Failture
(with
ATS
panel)
.
Start
‐
up
generator
1)
Set
every
circuit
breaker
and
switch
of
loads
to
“
OFF
”
position.
2)
Turn
the
Generator
set
Main
Circuit
Breaker
and
other
circuit
breakers
to
the
“
OFF
”
position.
3)
Connect
the
engine
battery
cable
with
battery.
4)
Turn
on
the
panel
power
switch
1S1
(
Ref.
Appendix
D
circuit
diagram)
to
the
start
position.
5)
Press
the
module
start
button.
6)
If
generator
set
assemble
pre
‐
heater
(air
intake
or
water
pre
‐
heater).
The
Pre
‐
heat
engine
will
illuminate
on
module
LCD.
Preheating
time
varies
by
coolant
temperature.
Usually
water
pre
‐
heater
completes
in
about
60
seconds,
air
intake
pre
‐
heater
completes
10
seconds.
After
preheating
the
LCD
puts
out
and
the
engine
begins
to
start.
It
will
attempt
to
start
again
about
5
seconds
later
if
the
engine
fails
to
start.
7)
After
the
engine
starts
successfully,
allow
the
engine
to
warm
up
for
about
5
minutes.
If
the
engine
could
not
fire
during
the
pre
‐
set
number
of
attempts
to
start
(start
attempts
number:
3
times),
the
Alarm
LCD
would
flash.
If
you
need
to
restart,
wait
at
least
30
seconds
before
the
retry.
8)
Check
the
reading
of
Voltage
Meter
and
Frequency
Meter
by
operating
the
Voltmeter
Change
‐
Over
Switch.
Once
the
generator
set
is
running
at
the
correct
voltage
and
frequency,
Turn
the
Generator
set
main
circuit
breaker
to
“
ON
”
.
9)
Turn
on
every
switch
or
circuit
breaker
of
loads
(from
heavy
to
light
load
in
sequence),
send
power
to
the
load
side.
Control
panel
introduction
NO
Model
1
start
panel
power
switch
2
battery
charger
switch
3
fuse
4
battery
charger
5
control
module
6
electric
governor
3.6.2
Generating
set
control
system
To
control
and
monitor
the
generating
set,
an
electronic
control
system
has
been
used.
P10/16
model
control
system
is
fitted
from
10
kVA
to
2000
KVA
single
generator
set
running
system.
P20/25
control
system
is
fitted
from
10
kVA
to
2000
kVA
transfer
with
mains
power.
Control
panel
provides
a
means
of
starting
and
stopping
the
generating
set,
monitoring
its
operation
and
output
and
automatically
shutting
down
the
set
in
the
event
of
critical
condition
arising
such
as
low
oil
pressure
or
high
engine
temperature.(DSE
Control
system
please
read
the
DSE
user’s
manual)
P20/25
control
system
module
introduction
Main
function
of
P20/25
The
control
system
of
diesel
generator
set
is
developed
through
the
use
of
model
AMF20/25
module,
a
special
diesel
controller,
made
by
Czech
COMAP
Company.
This
module
is
mainly
used
for
auto/manual
start
‐
up,
protective
stop
and
manual/auto
switchover
the
generator
set
power
and
mains
power.
It
can
also
remote
Summary of Contents for DHY11KSE
Page 1: ...Diesel Generator User Manual...
Page 2: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ...DHY10KE KSE DHY250KE KSE...
Page 36: ...DHY10KE KSE DHY250KE KSE...
Page 37: ...DHY10KE KSE DHY250KE KSE...
Page 38: ...DHY10KE KSE DHY250KE KSE...
Page 39: ...DHY10KE KSE DHY250KE KSE...
Page 40: ...DHY10KE KSE DHY250KE KSE...
Page 41: ...APPENDIX E 1...
Page 42: ...2...
Page 43: ...3...
Page 46: ...APPENDIX H...
Page 47: ......