4-14 Inspection, Maintenance and Adjustment
3. Remove old O-ring seal and install new O-ring seal (1, Fig.
10) onto bushing (2). Confirm that the O-ring seal on con
-
necting rod cover (4) and bucket bushing has been thor-
oughly cleared.
4. Align the bucket connecting rod cover and the bucket link
pin hole, and install bucket pin (3, Fig. 8).
5. Install new O-ring seal 1(1, Fig. 9) into O-ring seal.
Fig 9
Fig 10
Summary of Contents for HL630VL
Page 1: ......
Page 3: ......
Page 5: ......
Page 7: ......
Page 51: ......
Page 61: ...2 10 Operation Controls Schematic Fig 11 ...
Page 119: ......
Page 126: ...Inspection Maintenance and Adjustment 4 7 LUBRICATION OIL AND MAINTENANCE CHART Figure 4 ...
Page 161: ......