3-29
When the swing and arm functions are operated simultaneously, the swing spool and arm spools in
the main control valve are moved to the functional position by the pilot oil pressure from the remote
control valve.
The oil from the A1 pump flows into the swing motor through swing spool and the arm cylinder
through arm 1 spool.
The oil from the A2 pump flows into the arm cylinder through the arm 2 spool of the right control
valve.
The super structure swings and the arm is operated.
Refer to page 3-13 for the swing operation preference function.
3. COMBINED SWING AND ARM OPERATION
LEFT
RIGHT
Pc42
Pb3
Pd41
B2
A2
Pb1
A1
B1
Pa1
T1
V3
Pd2
Pc2
D2
C2
Pc1
D1
C1
P0
DR0
Pd1
Ai
B4
B5
A5
Pa5
Pb5
Pa4
Pb4
C5
D5
D4
C4
Pc41
Rs
C6
D6
DR4
P03
Patt
P02
Pn2
Pn1
Po5
Puo
P04
DR2
Pc3
Pa21
Pb21
Pb20
Pa20
DR1
DR5
DR3
Pc40
Pd40
PS
PS
Pi1(Pump)
Pi2(Pump)
ARM
CYLINDER
BUCKET
CYLINDER
BOOM
CYLINDER
TURNING
JOINT
TRAVEL MOTOR
SWING MOTOR
A1
PUMP
A2
PUMP
PILOT
PUMP
HYDRAULIC TANK
Pa20
Pd41
Pc40
Pc41
DOZER
CYLINDER
P02
P04
Pc5
Pd5
Pd6
Pc6
Pu
P1
P2
P3
Pd0
TRAVEL
STRAIGHT
TRAVEL
TRAVEL
BOOM 1
SWING
BOOM 2
ARM 1
OPTION B
OPTION C
(DOZER)
ARM
BUCKET
ARM 2
REGEN
140L3HC25
Summary of Contents for HX145 LCR
Page 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Page 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Page 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Page 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...