8-79
2209A8SM45
2209A8SM46
ASSEMBLING CARRIER SUB ASSY & SUN GEAR
7)
Put No.2 carrier sub assy along spline of
drive shaft spline.
Screw M10 I-bolt to No.2 carrier sub assy.
Lifting up No.2 carrier sub assy and align
planetary gear and tooth of ring gear by
rotating planetary gear by hands.
Rotate No.2 carrier sub assy by hands to fit
No.2 carrier sub assy into drive shaft spline.
Put No.2 sun gear into No.2 carrier sub assy.
(1)
(2)
-
-
-