8-152
B OOM A SSEMB LY
Removal
Remove arm and bucket assembly.
For details, see removal of arm and
bucket assembly.
Remove boom cylinder assembly from
boom.
For details, see removal of arm cylinder
assembly.
1
2
1
Crane
3
4,5,6
(1)
刮
刯
3)
Install
Carry out installation in the reverse order
to removal.
When lifting the arm assembly, always
lift the center of gravity.
B leed the air from the cylinder.
(2)
刮
侍
Remove bolt (4), plate (5) and pull out
the pin (6) then remove boom assembly.
余
Weight : 2600 kg (5730 lb)
When lifting the boom assembly always
lift the center of gravity.
刳
侍
Disconnect head lamp wiring.
Disconnect bucket cylinder hoses (2)
and arm cylinder hoses (1).
When the hoses are disconnected, oil
may spurt out.
Sling boom assembly (3).
到
刱
侍
刲
36078A T08
21078DA 45
36078A T09
21078DA 46