COBALT Pro
™
Wall Sensor Activated
Exposed Flush Valve Installation Instructions
I-CON Systems, Inc., for product support call 1-866-730-7192 or visit us online at support.i-con.com
One or more products contained herein are protected by U.S. Patent with other undergoing the patent process www.i-con.com/patents
Part No. 101822 : 3000 Series
EXPOSED SENSOR
FLUSH VALVE ROUGH-INS
3050
3055
2 14 "
57
MIN
11 12 "
292
4 34 "±
1
2 "
121±13
4 12 "
114
6"
152
1" [25] IPS
SUPPLY
COMMERCIAL CUTSHEET
TO CHANGE
ANNOTATION SHOULD BE \\i-consystems.int\Operations\CAD Drawings\TEMPLATES\ANSI-CUTSHEET-TEMPLATE.sldstd
•
SET NORMAL LINE THICKNESS TO .004
•
SET THIN LINE THICKNESS TO .002
•
ADJUST SHEET SCALE TO FILL PAGE
•
SET FRACTIONAL DISPLAY TO VERTICAL
•
SET BENT LEADER LENGTH TO 0.1" IN ANNOTATION AND DIMENSIONING
•
TEXT SHOULD BE ALL CAPS
•
DUAL DIMENSION MEASUREMENT (MILLIMETER) SHOULD MATCH THE FRACTIONAL DISPLAY (INCHES)
•
TEMPLATE INFORMATION
PAGE SIZE 3"x3"
•
CENTURY GOTHIC SIZE 8 FONT
•
ONE-TIME SYSTEM SETTING CHANGE
DIMENSIONS NON-IMPORTED (DRIVEN) AND DIMENSIONS (DANGLING) SET TO BLACK
•
SKETCH (INACTIVE) AND SKETCH (UNDEFINED) SET TO BLACK
•
SET PDF EXPORT LINES AND SHADED EDGES TO HIGH QUALITY
•
SET PDF EXPORT SHADED/DRAFT GEOMETRY AND SHARPENED OLE DPI TO 600
•
2 14 "
57
MIN
11 12 "
292
4 34 "±
1
2 "
121±13
6"
152
4 12 "
114
3
4" [19] IPS
SUPPLY
COMMERCIAL CUTSHEET
TO CHANGE
ANNOTATION SHOULD BE \\i-consystems.int\Operations\CAD Drawings\TEMPLATES\ANSI-CUTSHEET-TEMPLATE.sldstd
•
SET NORMAL LINE THICKNESS TO .004
•
SET THIN LINE THICKNESS TO .002
•
ADJUST SHEET SCALE TO FILL PAGE
•
SET FRACTIONAL DISPLAY TO VERTICAL
•
SET BENT LEADER LENGTH TO 0.1" IN ANNOTATION AND DIMENSIONING
•
TEXT SHOULD BE ALL CAPS
•
DUAL DIMENSION MEASUREMENT (MILLIMETER) SHOULD MATCH THE FRACTIONAL DISPLAY (INCHES)
•
TEMPLATE INFORMATION
PAGE SIZE 3"x3"
•
CENTURY GOTHIC SIZE 8 FONT
•
ONE-TIME SYSTEM SETTING CHANGE
DIMENSIONS NON-IMPORTED (DRIVEN) AND DIMENSIONS (DANGLING) SET TO BLACK
•
SKETCH (INACTIVE) AND SKETCH (UNDEFINED) SET TO BLACK
•
SET PDF EXPORT LINES AND SHADED EDGES TO HIGH QUALITY
•
SET PDF EXPORT SHADED/DRAFT GEOMETRY AND SHARPENED OLE DPI TO 600
•
page 3
Rev 080323
ELECTRICAL BOX INSTALLATION - TYPICALLY
COMPLETED DURING ROUGH-IN
Step 1
Install 2-gang electrical box (4” x 4” x 2-1/2”). The location will
vary based on the rough-in. Refer to the rough-in drawings for
specific mounting location. Use a GFCI plaster ring.
4X4 JUNCTION
BOX
GFCI PLASTER RING
I-CON IR PLATE
AN I-CON IR PLATE MOUNTS TO
GFCI JUNCTION BOX COVERS
OPTIONAL SWEAT SOLDER THREADED ADAPTER
INSTALLATION (FOR WATER SUPPLY LINES THAT
DO NOT HAVE MALE THREADS)
Step 1
Measure distance from finished wall to centerline of fixture
spud. Cut water supply pipe 1-1/4” (32mm) shorter than this
measurement. Chamfer then deburr inner and outer diameter
of water supply pipe.