CABLINE-UM Assembly Manual
Document No.
ASM-18003
4 / 20
Confidential C © DAI-ICHI SEIKO Co., Ltd.
5.作業⼿順 (Work procedures)︓
5-1. 芯線の半⽥付け (Soldering of center-conductor)
①
まず適合ケーブルの端末処理形状を下図の様にして下さい。
The cables have to be fabricated as shown below in advance of soldering.
Micro-Coax AWG#**
a
b
c
#36
0.15
0.29
0.39
#38
0.12
0.29
0.39
#40
0.09
0.21
0.33
#42
0.075
0.20
0.28
#44
0.063
0.18
0.26
Micro-Coax #36: Power Only
Recommended Micro-Coax Dimension
Micro-Coax Dimension
Pos.
A
30P
11.60
40P
15.60