background image

 

 

Cycle Racks 

Ensure sufficient fixings are used to secure the cycle rack to the ground. 

The holes to bolt the cycle rack to the ground are Ø13.5mm. 

Cycle racks are supplied as an optional extra.

 

Installation will vary depending on the option purchased.

 

NOTE:  

The hoops must be bolted to the rails before the rails are bolted to the 

 

 

ground. 

Fig 14 

Fig 13 

Summary of Contents for CIRCONOMY

Page 1: ...E HODDLESDEN DARWEN LANCASHIRE BB3 3NQ Tel 44 0 1254 703212 Fax 44 0 1254 707407 WEB www multihog co uk BF J000 0007 05 V1 2 SEP 2015 MOSSFIELD ROAD ADDERLEY GREEN STOKE ON TRENT STAFFORDSHIRE ST3 5BW...

Page 2: ...1 General Dimensions Safety Stages of the installation may require the use of personal protection equipment When working at heights refer to HSE guidance Fig 1...

Page 3: ...sure that the foundations are suitable for the ground conditions The base plate supplied with the Circonomy shelter is drilled with 19 holes The installer should ensure that the ground fixings are suf...

Page 4: ...socket button head screws Fit the top and the base purlins to the side panels using M10 x 70 socket dome head screws Bolt the centre trimmer to the top and base purlins using M10 x 70 socket dome hea...

Page 5: ...re Fit the intermediate purlins between the end panels and the centre trimmer Use M10 x 70mm socket dome head screws to bolt to the end panels Use M10 x 80mm socket button head screws to bolt through...

Page 6: ...a drill screw Drill until it starts to thread then remove and clean to remove all swarf See Fig 11 Make sure to allow a 10mm gap between the two sheets Pre drill 10mm holes in sheet first to match pu...

Page 7: ...Plastic Installation 6 Fit 50x3mm cover strips using 5 5x32 drill screws When fitting these strips it is important that you work from one end Fig 12 Apply 19mm wide tape to the strip before fitting...

Page 8: ...to the ground The holes to bolt the cycle rack to the ground are 13 5mm Cycle racks are supplied as an optional extra Installation will vary depending on the option purchased NOTE The hoops must be bo...

Page 9: ...ness Rigidity of cycle hoops Tightness of all fixings Signs of corrosion or wear Missing parts Structural integrity Maintenance of plastic sheeting Wipe down regularly with warm soapy water using a no...

Page 10: ...Exploded Detail 9 Fig 15...

Page 11: ...10 Bill Of Materials NOTE IAE do not supply ground fixings IMPORTANT Only use genuine IAE service parts when servicing IAE equipment...

Page 12: ...MOSSFIELD ROAD ADDERLEY GREEN STOKE ON TRENT STAFFORDSHIRE ST3 5BW TEL 44 0 1782 339320 FAX 44 0 1782 339321 WEB www iae co uk For further information contact your Authorised Dealer Dealer Stamp...

Reviews: