38
6. Inspection/Maintenance
6.3 Battery
Replacement
6.3.1 Preparation
The following items are required when replacing the batteries:
x
Hex wrench (2.5 mm)
x
New dedicated batteries for IX (4 pieces)
Model: AB-3
Before replacing the batteries, turn off the power to the controller, control panel and other relevant units.
z
Performing inspection or maintenance without fully understanding the details of work may result in
a serious accident.
z
Display a “Work in Progress” sign so that other operators will not operate the controller, operation
panel, etc.
z
Use dedicated batteries for IX. Batteries for the old model (IH) cannot be used.
Warning
Caution
Summary of Contents for Intelligent Actuator IX Series
Page 2: ......
Page 55: ...49 6 Inspection Maintenance 6 Click the Servo OFF button 7 Press the emergency stop switch ...
Page 75: ......