8. Installation Environment and Storage Environment
8. Installation Environment and Storage Environment
8.1 Installation
Environment
Install the robot in an environment that satisfies the following conditions:
Away from direct sunlight
Not subject to radiated heat from a high-capacity energy source such as a heat-treating furnace
Surrounding air temperature: 0
C to 40
C
Humidity: 85% or less (non-condensing)
Not exposed to corrosive or flammable gases
Not subject to impact or vibration
Not exposed to a significant amount of electromagnetic waves, ultraviolet rays or radiation
Sufficient space is available to ensure safety in teaching and maintenance/inspection operations
Generally, the robot must be installed where the operator need not wear protective gear in order to work.
8.2 Installation
Platform
The platform on which to install the robot receives a significant reactive force. Be certain the platform has
sufficient rigidity to withstand the anticipated force.
The surface on which the robot is fixed must have a thickness of 25 mm or more.
The levelness of the robot installation surface must be at least
0.05 mm.
Machine tapped holes of the size shown in the table below in the mounting surface of the platform.
Model number
Tapping size
Remarks
IX-HNN50
/60
IX-INN50
/60
M10
The effective thread shall be 10 mm or more (for steel, or 20
mm or more for aluminum).
IX-HNN70
/80
IX-INN70
/80
M12
The effective thread shall be 12 mm or more (for steel, or 24
mm or more for aluminum).
The platform must have sufficient rigidity to withstand not only the weight of the robot but also the dynamic
moment of inertia that is generated when the robot is operated at maximum speed.
Secure the platform to the floor or other rigid structure in a manner that prevents any movement due to
operation of the robot.
The installation platform must allow the robot to be mounted on a level surface.
Summary of Contents for IX Series
Page 2: ......
Page 4: ......
Page 56: ...50 9 How to Install ...
Page 58: ...52 9 How to Install Center of recommended installation part ...
Page 104: ......
Page 105: ......