AST1257-940
Page
9
Table of Contents
Page
Introduction ……………………………………………………………… 10
Superior Design
Superior Operation
Installation ……………………………………………………………….. 10
Location Selection
Water Line Connection
Drain Line Connection
Brine Line Connection
Brine Tank Overflow Line Connection
Electrical Connection
Placing Conditioner into Operation …………………………………. 13
Adjustment of Timer ……………………………………………………. 14
Special Features of Timer
Adjustment of Brine Control ………………………………………….. 14
How to Set the Salt Dial
Service ……………………………………………………………………. 15
Removing the Timer Assembly
Removing the Valve Assembly
Preventative Maintenance …………………………………………..… 17
Injector Screen and Injector
Specifications …………………………………………………….……... 18
Pressure Graphs ……………………………………………………..…. 19
Control Valving identification…………………………………………. 20
Valve Disc Operation ………………………………………….……….. 20
Flow Diagrams …………………………………………………………... 21
Replacement Parts ……………………………………………………... 22
Trouble Shooting …………………………………………………….…. 26
Disinfection of Water Conditioners………………………………….. 27
Summary of Contents for AST1257-940
Page 20: ...AST1257 940 Page 20 Control Valving Identification Valve Disc Operation...
Page 21: ...AST1257 940 Page 21 Flow Diagrams...
Page 22: ...AST1257 940 Page 22...
Page 24: ...AST1257 940 Page 24...
Page 25: ...AST1257 940 Page 25 Valve Body and Tank Adaptor Module...
Page 29: ...AST1257 940 Page 29...