1.  Connect the boiler to a dedicated (max.)15 

Amp breaker.

2.  Wire incoming 120 VAC to the black and white 

wires labeled “AC In” in the field wiring box.

3. 

Ensure that the boiler is properly bonded 

(grounded).

4.  Refer to the “Wiring Diagrams” section in the 

Installation and Operating Instructions

 manual 

• 

For multiple-boiler setup, use a secondary loop sensor.

• 

For zone valves or external peripherals such as wi-fi 

thermostats, use external transformers.

Note:

 If a load is defined as Reset Heating, the 

outdoor sensor is needed for proper operation. 

Electrical

 continued 

(Section 3.13

)

Water Piping 

(Section 3.11)

• 

Place air separators at the highest point.

• 

Install the pressure relief valve on the outlet 

piping of the boiler in a vertical position. Do not 

use an isolation valve between the boiler and 

relief valve.

•  Support all piping with appropriate piping 

brackets.

• 

Plumb an appropriately sized expansion tank and 

make up the water station into a fitting on the 

suction side of the circulator. 

• 

Size boiler piping and pump for the BTU output of 

the boiler.

For non-oxygen barrier piping systems, use a dirt 

separator and/or a side-stream filter. 

Ensure that the 

system is free of iron components, and treat with an 

inhibitor.

We recommend that you always use a primary/

secondary piping configuration (see below for a basic 

configuration).

In the case of hard water, use distilled or purified 

water (but not reverse-osmosis). Glycol systems 

must use propylene glycol. For large volume 

systems, the optimum hardness is 0.6 to 1 grain.

Water Chemistry Allowable Limits

Acidity pH

6.6 - 8.5

Chloride

< 125 mg/l

Iron

<  0.3 mg/l

Copper

< 0.1 mg/l

Conductivity

400μS/cm (at 77°F / 25°C)

Water Hardness

0.6 to 1.75 grains/ gal

Load Setup

1.  On the V-10 Touchscreen controller bottom 

navigation bar, tap the 

Setup

 icon 

2.  Select a load and then select the load type.
3.  Accept the defaults, or change any of the 

settings.

You can find more substantial settings in 

More

 > 

Advanced Setup

4.  Tap the 

Save

 button. 

Manual Pump Purge

After the system is pressurized and you have 

defined loads, perform a manual pump purge to 

ensure air is purged.

On the touchscreen controller, go to 

More

System 

Settings

 > 

Site Settings

>Set 

Manual Pump Purge 

to 

"

On

">

OK 

Save.

The manual pump purge runs until it is turned off, or 

when there is a call for heat.

Electrical

 

(Section 3.13

)

(Appendix) for more information.

5. Wire the respective load pumps into the TB1 

Terminal; for example, P/V 1, 2, 3, 4.

6. 

Wire thermostats or end switch dry contacts to 

Therm 24 Vac, and then connect the other wire 

to Therm 1, 2, 3, 4 corresponding to load pumps 

P/V 1, 2, 3, 4.

7. No wiring is necessary for the On-Demand DHW 

load.

Checklist

Treated water or Polypropylene glycol mixture in 

the pipes.

Boiler system is pressured and flushed ≥ 8 psi.

All gas connections soap-tested for leaks and now 

leak free.

Voltage supply to the boiler tested for voltage 

(nominal 120 Vac), polarity, and properly 

grounded.

The boiler requires a dry set of contacts in the 

Therm connections, an external sensor, or 

External Control signal.

Boiler power turned on.

Use “Setup” in the touchscreen controller to set up 

the required loads. See above for instructions.

Steps followed in the “6.3 Commissioning” section 

of the 

Installation and Operating Instructions

 

manual.

Completed the Installation & Commissioning 

Report in manual - Combustion Test recorded.

Verified a CO alarm is installed and operational 

Closely-spaced tees: install tees with straight piping 
(minimum lengths are shown in pipe diameters), tees 
maximum four pipe diameters apart with no restrictions 
between fittings