INSTALLATION AND OPERATION INSTRUCTIONS
1-18
DC SERIES BOILERS / WATER HEATERS
DC 15-95, DC 15-96, DC 20-125, DC 33-160
1.5.3 Condensate Trap Assembly - cleaning procedure
1.
Turn off the power to the boiler / water heater and allow it to cool down.
2.
Remove the trap from the boiler / water heater (reverse the installation
procedure above).
3.
Remove the Trap Cleanout Assembly, from the Trap Body and clean and
flush the debris out.
4.
Re-assemble trap components, re-fill trap, and replace on boiler / water
heater as described in the installation instructions above.
1.5.4 Further installation details
•
Condensate drain must be piped to within 1" of a drain or be connected to a
condensate pump.
•
Drainage line must slope down to the drain at a pitch of 1/4" per foot so
condensate runs towards the drain.
•
Condensate traps should be checked every 2 months, and cleaned and
refilled as necessary.