Burner installation

Attaching the burner to the heat exchanger lid

1. Place the heat exchanger lid on a flat surface.

2. Position the burner gasket on the lid, aligning it with the screw holes.

3. Install the new burner in place:

a. Use the three M4 x 6 mm screws to secure the burner and gasket onto the new heat exchanger

lid.

b. Tighten the screws gradually by hand, plus an additional one-eighth (⅛) turn in a cross pattern.

Do not over-tighten.

4. Inspect the refractory for cracks, degradation and flatness. If in doubt, replace with a new one. (See

warning above regarding the refractory).

5. Carefully insert the refractory into the heat exchanger combustion chamber, using the alignment marks

for proper positioning.

6. Ensure that the orange heat exchanger lid gasket is in good condition, flat, and free of debris.

Reinstalling the burner and heat exchanger lid assembly

1. Carefully insert the lid-burner assembly straight down, ensuring that:

There is limited contact between the burner and refractory

The markings made previously on the lid, lid gasket, heat exchanger, and refractory are aligned.

2. Attach the heat exchanger lid and burner assembly onto the new heat exchanger with the six hex nuts

and perform the following:

a. Tighten nuts by hand in a cross pattern, similar to how the burner was tightened

b. Tighten an extra ½ to 1 turn.

Caution

Over-tightening will warp the heat exchanger lid and lid gasket, allowing fumes or
flames to leak.

3. Re-install the ignitor:

a. Position the ignitor gasket on the heat exchanger lid, aligning it with the screw holes.

b. Carefully insert the ignitor into the heat exchanger assembly by sliding it straight down.

c. Tighten the two #2 Phillips screws screws by hand, then an extra ⅛ turn.

4. Reconnect the following cables:

The ignitor cable

The gas valve cable

The two electrical connectors to the fan.

Summary of Contents for P-153B

Page 1: ...n exposed to extremely high temperatures the ceramic fibers that contain crystalline silica can be converted into cristobalite classified as a possible human carcinogen Avoid disturbing or damaging th...

Page 2: ...g kit The letter after the P kit number indicates the kit version For example P B would be an earlier version of P C The instructions and contents listed here are for the latest revision of this kit P...

Page 3: ...388E0 January 09 2023 Released Document 3 of 7 Boiler parts diagram SL 20 115 G1 SL 20 115 G2 A Fan B Gas valve C Gas supply line D Fan gasket E Ignitor F Heat exchanger lid G Burner gasket H Heat ex...

Page 4: ...rs of the boiler Removing the fan and gas valve assembly 1 Disconnect the two electrical connectors from the fan A 2 Disconnect the electrical connector from the gas valve B 3 Position the wiring harn...

Page 5: ...changer The refractory J should remain in place in the heat exchanger s combustion chamber shoulder There is less than 1 8 3 mm of clearance between the burner walls and the refractory ensure that the...

Page 6: ...s in good condition flat and free of debris Reinstalling the burner and heat exchanger lid assembly 1 Carefully insert the lid burner assembly straight down ensuring that There is limited contact betw...

Page 7: ...eleased Document 7 of 7 5 Reinstall the fan gas valve assembly by following the above steps backwards from Removing the fan and gas valve assembly on page 4 6 Test for leaks at the gas valve inlet 7 R...