1-13
INSTALLATION
SFC BOILER / WATER HEATERS - SFC 199
For side venting of multiple unit sets, group all intake terminals together with 6"
(minimum) lateral spacing, and similarly group the exhaust pipes. Place the 2
groups on the same plane of the building (e.g., north facing wall). Place the 2
groups of pipes at least 3' apart (the closest intake and exhaust pipes must be
36" - or more – apart). Use same 12" (minimum) vertical separation (see A in
Figure 12). Alternatively, as long as the units are identical models - intake and
exhaust terminals can maintain a minimum of 12" of separation horizontally from
any exhaust or inlet termination of an adjacent unit (see B in Figure 12). For
alternative group terminations, contact the IBC Factory for written guidance.
Concentric Side Wall Termination Kits
Installation of multiple Concentric Side Wall Termination kits:
•
On the same horizontal line (not stacked)
•
With a minimum vertical separation of 12” center to center
Refer to local code requirements or restrictions when installing concentric side wall
termination kits. Ensure that the termination and venting are sloped back to the unit.
Approved Concentric Side Wall Termination Kits are listed below: (Alternative
vent termination kits must be submitted to IBC for approval prior to installation.)
•
Centrotherm – Innoflue #ICWT242 (2” termination) + ICTC0224 (2” transition
to 2 pipe)
•
Centrotherm – Innoflue #ICWT352 (3” termination) + ICTC0335 (3” transition
to 2 pipe)
•
Duravent – Polypro #3PPS-HK – Horizontal Termination Kit – Concentric
•
Ipex #197006 – 3" PVC Concentric Termination kit
•
Ipex #197009 – 3" CPVC Concentric Termination kit
Figure 14: Prohibited installation
Figure 13: IBC recommended
minimum vent terminal clearance
under ventilated soffit
Figure 12: Sidewall vent termination - multiple vent piping configuration