1.
Attach the support bracket (supplied) to
the wall studs using the supplied
¼" x
2½"
long lag screws (min. 4) with ¼" flat
washers.
2.
Hook the boiler tab (located on
back of boiler) over the support
bracket flange.
3.
Ensure that the boiler tab is flush against
the mounting bracket flange.
4.
Secure the lower part of the
boiler to the wall with a minimum
of two field-supplied ¼" bolts.
3.5 Connecting the vent and air intake pipes
These appliances offer 3 or 4-inch connections that accept standard 3 or 4 inch PVC/CPVC and
(with adapter) PP pipe. Use available pipe-reducer fittings (not bushings) to adapt to smaller
diameter pipe. Insert PVC/CPVC pipe directly into the female fitting, and secure with the built-in
clamp (see image below). Venting must be supported in accordance with the applicable code.
18
Section: Installation
Summary of Contents for SL Series
Page 8: ...Intentionally left empty...
Page 12: ...Figure 5 Top view SL 40 399 G3 Figure 6 Bottom view SL 40 399 G3 8 Section Specifications...
Page 14: ...Intentionally left empty...
Page 64: ...Figure 40 Electric wiring connections 60 Section Installation...
Page 76: ...Intentionally left empty...
Page 96: ...Intentionally left empty...
Page 108: ...Intentionally left empty...
Page 110: ...Internal wiring diagram Figure 46 Internal wiring diagram 106 Section Appendices...
Page 111: ...Sequence of operations Figure 47 Sequence of Operation 107 Sequence of operations...