Warning
Important!:
Maintain at least the minimum separation of exhaust vent termination
from boiler intake air as illustrated in
,
,
and
. Failure to do so can result in a dangerous situation where exhaust gasses are re-
ingested with combustion air. Damage to the boiler can result from a failure to
maintain these separations. Third party vent termination kits and concentric wall
penetration kits that do not maintain these minimum separations must
not
be used.
Improper installation will void the warranty. Do not use proprietary InnoFlue or
PolyPro PP terminals without specific approval from IBC.
Caution
Take care installing Concentric Side Wall Termination kits when the outdoor
temperature drops below 5°F/-15°C. Possible blockage of the combustion air intake
can occur when the outdoor temperature drops below this temperature.
Figure 16
Vent termination clearance, side-by-
side perforations
Figure 17
Vent termination clearances, side-by-
side perforations, side view
32
Section: Installation
Summary of Contents for SL Series
Page 8: ...Intentionally left empty...
Page 12: ...Figure 5 Top view SL 40 399 G3 Figure 6 Bottom view SL 40 399 G3 8 Section Specifications...
Page 14: ...Intentionally left empty...
Page 64: ...Figure 40 Electric wiring connections 60 Section Installation...
Page 76: ...Intentionally left empty...
Page 96: ...Intentionally left empty...
Page 108: ...Intentionally left empty...
Page 110: ...Internal wiring diagram Figure 46 Internal wiring diagram 106 Section Appendices...
Page 111: ...Sequence of operations Figure 47 Sequence of Operation 107 Sequence of operations...