Ensure the supplied trap is
correctly installed and filled with
water.
When required, add (and maintain
in good condition) a neutralization
tank. For information on installing
a condensate neutralizer, see
The condensate trap must be
installed on the drain connection at
the base of the boiler. The
condensate drain must be piped to
within 1" of a drain or connected to
a condensate pump. The drainage
line must slope down to the drain
at a pitch of ¼" per foot so condensate runs towards the drain.
1.
Remove the boiler door.
2.
To remove the condensate retainer,
undo the two wing nuts. Retain for later.
38
Section: Installation
Summary of Contents for SL Series
Page 8: ...Intentionally left empty...
Page 12: ...Figure 5 Top view SL 40 399 G3 Figure 6 Bottom view SL 40 399 G3 8 Section Specifications...
Page 14: ...Intentionally left empty...
Page 64: ...Figure 40 Electric wiring connections 60 Section Installation...
Page 76: ...Intentionally left empty...
Page 96: ...Intentionally left empty...
Page 108: ...Intentionally left empty...
Page 110: ...Internal wiring diagram Figure 46 Internal wiring diagram 106 Section Appendices...
Page 111: ...Sequence of operations Figure 47 Sequence of Operation 107 Sequence of operations...