3.11.1 General piping best practices
3.13.1 Power management, quality and electrical protection
3.13.2 120VAC line-voltage hook-up
3.13.5 Thermostat / sensor wiring
3.13.6 Thermostat heat anticipator
4.0 About the boiler controller
5.0 Before operating the boiler
Checklist for electrical conditions, ducting and water connections
6.1 Lighting and shutting down the boiler
6.2 Testing the ignition safety shutoff
6.3.1 Checking a boiler's fuel source
6.3.2 Performing a fuel conversion
7.1 Maintenance checklist for homeowner
7.2 Maintenance checklist for heating contractor
7.2.1 Touchscreen boiler controller
7.2.2 General boiler maintenance
7.3 Replacing the fan, gas valve, and burner
2
Section: Contents
Summary of Contents for SL Series
Page 8: ...Intentionally left empty...
Page 12: ...Figure 5 Top view SL 40 399 G3 Figure 6 Bottom view SL 40 399 G3 8 Section Specifications...
Page 14: ...Intentionally left empty...
Page 64: ...Figure 40 Electric wiring connections 60 Section Installation...
Page 76: ...Intentionally left empty...
Page 96: ...Intentionally left empty...
Page 108: ...Intentionally left empty...
Page 110: ...Internal wiring diagram Figure 46 Internal wiring diagram 106 Section Appendices...
Page 111: ...Sequence of operations Figure 47 Sequence of Operation 107 Sequence of operations...