Checking piping connections
Check
Check to see that adequate gas pressure is present at the inlet gas supply test port.
□
Connect a manometer and open the gas control valve. Requirements are minimum 4" w.c
and maximum 14" w.c.
□
Check that there are no gas leaks.
□
All connections are pressure tested and leak free.
□
All piping flushed to ensure all air is removed.
□
Check valve is installed and the external pump is flowing in the correct direction.
□
Checking venting connections
Check
All connections are pressure tested and leak free.
□
All vent pipe is sized correctly and joints are sealed.
□
Powering on the boiler
Check
Perform a final check of electrical wiring, and provide power to the boiler to initialize
operation.
□
Warning
Fill the condensate trap with water before you first fire the boiler to prevent exhaust
fumes from entering the room. Never operate the boiler unless the trap is filled with
water. Failure to comply will result in severe personal injury or death.
64
Section: Before operating the boiler
Summary of Contents for SL Series
Page 8: ...Intentionally left empty...
Page 12: ...Figure 5 Top view SL 40 399 G3 Figure 6 Bottom view SL 40 399 G3 8 Section Specifications...
Page 14: ...Intentionally left empty...
Page 64: ...Figure 40 Electric wiring connections 60 Section Installation...
Page 76: ...Intentionally left empty...
Page 96: ...Intentionally left empty...
Page 108: ...Intentionally left empty...
Page 110: ...Internal wiring diagram Figure 46 Internal wiring diagram 106 Section Appendices...
Page 111: ...Sequence of operations Figure 47 Sequence of Operation 107 Sequence of operations...